Schylling

Schylling Ipswich, MA 100 parking spaces 4 acre site 40,000 square foot building Commercial septic system

Salem Glass

Salem Glass Salem, MA 10,000 cubic yards of material crushed and used on site 10,000 square yards of paving 4 acre site 45,000 square foot building Parking lot drainage Sewer service Water service

Wheelabrator

Wheelabrator Saugus/Millbury/North Andover, MA Excavate and backfill for new foundations at three locations Furnish and install new stormwater systems at two locations Maintain access and coordinate work with continuously operating facilities Remove, regrade and replace asphalt at three locations

UFP Plant Addition

UFP Plant Addition Newburyport, MA 7,000 cubic yards of cuts and fills 7,800 square yard parking lot expansion 900 square foot large concrete block retaining wall Large precast concrete subsurface drainage system New 42,000 square foot building addition

Wheelabrator Drainage Improvements

Wheelabrator Drainage Improvements Saugus, MA Construct new infiltration basin stabilized with screened loam and erosion control matting Install basin overflow catch basin, outlet pipe and headwall to wetland discharge location Install main entrance catch basin and outlet pipe to wetland discharge location Install new drainage improvements while maintaining access to operating facility Remove, regrade and […]

613 Main Street

613 Main Street Client: Jewett Construction | Wilmington, MA New curb, sidewalks, and new asphalt paving Excavation for interior structural and utility renovations Large pre-cast concrete underground drainage systems Water, sewer, electric, site-lighting and tele-data utility improvements Grading improvements including modular block retaining walls with guardrail

Tufts University Squash Courts

Tufts University Squash Courts Medford, MA Relocation of existing water main New 10,000 SF Squash Court Addition New subsurface stormwater drainage system

Tufts University Sports Center

Tufts University Sports Center Medford, MA 3 story building addition Maintain existing building access New sidewalks, curbing and paving Relocate water, sewer, and drain utilities

Tuft’s Cousens Gymnasium

Tuft’s Cousens Gymnasium Medford, MA New sewer service New water fire service New handicap accessible ramps

The Cambridge School of Weston

The Cambridge School of Weston Weston, MA 30,000 square foot building footprint 4,000 cubic yards of blasting and rock removal 8,000 cubic yard export Large underground precast concrete drainage system New parking lot and roadway paving, curbing and sidewalks New water, septic, drain, electric, communications, site lighting and gas utilities