100 Fordham Road

100 Fordham Road 100 Fordham Road – Wilmington, MA – New ground up 118,950 SF warehouse building. – 8,500 CY of cuts and fills with ledge removal. – 3 modular block retaining walls. – Presby septic system with 2-10,500-gallon septic tanks and 2-8,000-gallon pump chambers. – New water, drainage, electric, and site lighting utilities. – […]
2Life Solimine House

– Urban infill site development supporting an affordable and supportive housing residential project in the City of Lynn. – Clearing, excavation, and grading including approximately 40,000 CY of cut and fill to prepare building pads, access, and utilities. – Construction of underground infrastructure including new water, sewer, and drainage piping, along with associated manholes and […]
Ferncroft Country Club

– 10,000 SF of new structures and additions to support upgrades to the county club’s gym, kid’s camp, and driving range – Water, sewer, drainage, electrical, communications, site lighting, and gas upgrades – Parking lot rehab with 7,000 SY of paving including granite & precast curbing – Over 10,000 SF of new patios, sidewalks, and […]
Flight Level Aviation

– New 40,000 SF Airplane Hangar building. – 7,500 CY of cuts and fills and 5,000 CY of loam strip. – All new site utilities including water, sewer, drainage, electric and tel/data. – 5,500 SY of asphalt pavement.
Herb Chambers Medford

– 43,500 SF 3 story addition to existing 5 story building. – 6,000 CY of lightweight aggregate fill imported. – Support of ground improvements for new building foundations. – New drainage improvements including 34 structures, 1,700 LF of pipe, and 1 underground chamber system. – New water, sewer, electric, tel-data, and site lighting utilities. – […]
600 Griffin Brook Drive-Methuen

– Land clearing and development of a 7-acre site – Ground up 95,7000 SF warehouse building – Ledge blasting and material processing – 15,000 SY of asphalt paving – 8,000 SF of retaining walls – Underground drainage retention system – New water, sewer, and drainage services
295 Eastern Ave Chelsea

– New ground up 114,000 SF warehouse building. – 25,000 CY of imported structural fill. – Support of ground improvements for new building foundations. – New drainage improvements including 35 structures, 3,500 LF pipe, 2 underground chamber systems, 2 precast outfalls along Chelsea River, and multiple rain gardens. – New water, sewer, electric, tel-data, and […]
152 Endicott Street – Danvers

Endicott Street: – 15,000 CY earthwork operation – 7,000 SF of big block retaining walls – New 11,000 SF office building & new 15,000 SF pad ready hotel – New Stormtech detention systems – New box culvert – New underground utilities including water, sewer, drain, electric, communications, site lighting, and gas – New parking lot […]
Lowell Community Health Center

Lowell Community Health Center Lowell, MA Interior rehabilitation project to existing mill building Demolition of existing asphalt floor surface and foundations Removal and disposal of 500 tons of petroleum impacted soils Grading and gravel installation for new 12,000 square foot slab on grade Excavation and backfill for new elevator pit foundation, interior plumbing trenching and […]
Pointe at Hill Farm

Pointe at Hill Farm The Pointe at Hills Farm- Shrewsbury – New parking lot with curbing and sidewalks – MC-3500 Stormtech infiltration system – New underground utilities including water, sewer, drain, electric, communications, site lighting, and gas – 16,000 SF of retaining walls and riprap slopes – 30,000 CY cut/ fill operation – Ledge blasting […]