Herb Chambers Medford

– 43,500 SF 3 story addition to existing 5 story building. – 6,000 CY of lightweight aggregate fill imported. – Support of ground improvements for new building foundations. – New drainage improvements including 34 structures, 1,700 LF of pipe, and 1 underground chamber system. – New water, sewer, electric, tel-data, and site lighting utilities. – […]
600 Griffin Brook Drive-Methuen

– Land clearing and development of a 7-acre site – Ground up 95,7000 SF warehouse building – Ledge blasting and material processing – 15,000 SY of asphalt paving – 8,000 SF of retaining walls – Underground drainage retention system – New water, sewer, and drainage services
295 Eastern Ave Chelsea

– New ground up 114,000 SF warehouse building. – 25,000 CY of imported structural fill. – Support of ground improvements for new building foundations. – New drainage improvements including 35 structures, 3,500 LF pipe, 2 underground chamber systems, 2 precast outfalls along Chelsea River, and multiple rain gardens. – New water, sewer, electric, tel-data, and […]
Residences at Belmont

– Land clearing and grubbing of 10-acre site for new apartment building and Townhome development. – 50,000 CY of cuts and fills, 35,000 CY of ledge blasting with crushing/material processing. – 10,000 SF of new modular block retaining walls, Building prep for apartment building to include below grade parking garage. – 4 new ‘StormTrap’ detention […]
Merrimack College-Lecture Hall

– New 2-story academic building next to Sullivan Hall. – All new site utilities including water main relocation and services, sewer, drainage, electric, tel/data, and site lighting. – New ‘StormTrap’ 5’-0” tall Single Trap precast drainage system. – New paving, curbing, sidewalks, and hardscape improvements.
Powder Mills Apartments-Acton

Powder Mill Apartments – Acton MA – 18,000 CY earthworks operation – New parking lot with curbing and sidewalks – Excavate and backfill for 7,000 LF of under slab plumbing – New underground utilities including water, sewer, drain, and electric utilities as well as a water quality unit and two underground infiltration systems – Excavate […]
Merrimack College Corner Development-North Andover

Merrimack College Corner Development – North Andover, MA (Client – Greystar) – Two new 4-story mixed-use buildings with amenities, dorms, and academic space. – 8,500 CY import site with 3,500 CY of cuts and fills. – All new site utilities including water, sewer, drainage, electric, tel/data, and site lighting. – 3 ‘StormTrap’ drainage systems and […]
152 Endicott Street – Danvers

Endicott Street: – 15,000 CY earthwork operation – 7,000 SF of big block retaining walls – New 11,000 SF office building & new 15,000 SF pad ready hotel – New Stormtech detention systems – New box culvert – New underground utilities including water, sewer, drain, electric, communications, site lighting, and gas – New parking lot […]
Pointe at Hill Farm

Pointe at Hill Farm The Pointe at Hills Farm- Shrewsbury – New parking lot with curbing and sidewalks – MC-3500 Stormtech infiltration system – New underground utilities including water, sewer, drain, electric, communications, site lighting, and gas – 16,000 SF of retaining walls and riprap slopes – 30,000 CY cut/ fill operation – Ledge blasting […]
Lynnway Residential

Lynnway Residential Lynnway Residential – Lynn MAPlumb House New multi-story residential building with ground level parking garage Excavate and backfill for new foundations and footings including Geopier support New water, sewer, drain, and electric utilities including 5 water quality units Excavate and backfill for over 7,600 LF of under slab plumbing New asphalt paving and […]