Brooksby Village

Brooksby Village Peabody, MA Demolish existing curbing, walkways and parking Full depth reconstruction of existing parking areas Installation of underdrains beneath parking lots and walkways to improve drainage New granite curbing, concrete and bituminous walkways

Caldwell Farm

Caldwell Farm Newbury, MA 125 acre site 24 buildings 5 detention basins 5,200 linear feet of roadway 66 units of townhouses 70,000 cubic yards of cut and fill

Coolidge at Sudbury

Coolidge at Sudbury Sudbury, MA Demolish existing house Drainage system with detention pond Large concrete block retaining wall Large presby septic system Parking lot paving and curbing Preparation for apartment building Roadway intersection improvements

Edgewood Life Care Center

Edgewood Life Care Center North Andover, MA 144 units and nursing home 20 acre site 23,500 square yards of paving 3,800 linear feet of drain 3,900 linear feet of sewer 6 buildings, total footprint 100,000 square feet 73 drain structures 75,000 cubic yards of fill moved onsite 9,200 linear feet of water main

North Hill Wellness Center

North Hill Wellness Center Needham, MA 1,100 square feet of Versa-lok retaining wall 30,000 square foot addition 300 linear feet of sewer 5,000 cubic yards of export 7 catch basins 700 linear feet of drain 8 drain manholes Underpinning and soilnailing for foundation excavation

Patton Ridge

Patton Ridge Hamilton, MA 1,000 ft of new roadway 12 New residential homes Large subsurface wastewater disposal system New paving, curbing and sidewalks New water, sewer, drain and electrical utilities

English Commons

English Commons Topsfield, MA 1 large shared septic system 1,500 linear feet of directional drilled water main 22 buildings 4 detention basins 4,000 linear feet of road 52 units of townhouses 70 acre site

Sunrise at Gardner Park

Sunrise at Gardner Park Peabody, MA 5,000 square yards of paving 50,000 square foot building Drain Water service

Rolling Green

Rolling Green Topsfield, MA 55+ condominium community with 30 units New curbing, sidewalks and landscaping New water, sewer, drain, electric, site lighting and gas utility improvements Over 27,000 cubic yards of imported fill Presby Enviro septic system

The Woods at Merrimack

The Woods at Merrimack Methuen, MA 12,000 cubic yards of cuts and fills and 6,000 cubic yards of soil export 2 modular block retaining walls and 2 drainage basins 8,000 square yards of parking lots and drives with 5,000 feet of curbing and sidewalks All new site utilities including looped water main and cross country […]