Route 114 – Sewer

Route 114 – Sewer North Andover, MA 12,000 linear feet of forcemain sewer 15 manholes 2 pump stations 5,000 linear feet of gravity sewer

Route 113 Improvements

Route 113 Improvements Newburyport, MA 11,000 square yards of milling and overlay pavement Excavation and prep work for new traffic signals and conduit New granite curbing, concrete sidewalks and thermoplastic pavement markings Roadway widening and paving improvements to State highway

Linebrook Road – Water

Linebrook Road – Water Ipswich, MA 15 water services 4,500 linear feet of 8″ ductile iron water main 5 fire hydrants

Brooksby Village Improvements

Brooksby Village Improvements Peabody, MA Reclaim and repave 4,850 square yards of asphalt Remove and replace 2,200 linear feet of curbing Remove and replace 425 square yards of sidewalk Roadway and parking lot improvements to active retirement community

Coolidge at Sudbury Phase 2

Coolidge at Sudbury Phase 2 Client: Keith Construction | Sudbury, MA 3 modular block retaining walls and 1 infiltration basin 4,500 cubic yards of cuts and fills and 4,000 cubic yards of soil export Large Presby septic system with pump station and 19,000 gallon septic tank New 3 story senior living facility with underground parking […]

Senior Residences at the Machon

Senior Residences at the Machon Client: Keith Construction | Swampscott, MA 3 new Redi Rock retaining walls 4,500 cubic yard export site with ledge removal Large underground drainage system below parking lot New addition to former school that will be converted to senior housing New parking lot pavement, sidewalks, walkways, granite curbing and guardrail Utility […]

Brightview at Wakefield

Brightview at Wakefield Wakefield, MA 4,000 cubic yards of soil export New building with garage underneath New water, sewer, drain and electrical utilities Relocation of sewer and drain mains Temporary earth retention

Brookhaven at Lexington

Brookhaven at Lexington Lexington, MA 1,000 linear feet of sewer pipe 1,000 linear feet of water pipe 10,000 cubic yards of fill exported 100,000 square foot building addition 2,000 linear feet of drain pipe 30 acre site 350 linear feet of boulder retaining wall 4,000 linear feet of electrical trenching 5,000 square yards of parking […]

Brooksby Village

Brooksby Village Peabody, MA Overlay pave 3,000 square yards of asphalt Reclaim and pave 5,000 square yards of asphalt Remove and replace 1,000 linear feet of sidewalks Remove and replace 4,000 linear feet of curbing Roadway Improvements to Active Retirement Community