Merrimack College Parking Lot Improvements

Merrimack College Parking Lot Improvements North Andover, MA 3,000 LF curb and 8,500 SF of Sidewalks Bio-retention drainage swale with underdrain system New 11,000 SY Parking lot New site lighting and existing utility relocations Removal and replacement of drainage system on active campus

Merrimack College Dormitories

Merrimack College Dormitories Andover/North Andover, MA 4 new dormitories and 1 new commons building New development within active campus New water, sewer, drain and electrical utilities Relocation of sewer and drain mains offsite Temporary and permanent roadway relocation

Phillips Academy Boathouse

Phillips Academy Boathouse Methuen, MA New gravel parking lot New onsite drainage system New parking lot paving New utility services to existing building

Fay School

Fay School Southborough, MA 2 new dormitory buildings 50 acre campus Extensive site and utility improvements Includes work on 3 contracts over 2 years New maintenance building New primary school building New wastewater treatment facility

Brookwood School

Brookwood School Beverly, MA 1,000 linear feet of 8″ ductile iron water main Misc repairs on site

Dana Hall School

Dana Hall School Wellesley, MA 38,000 square foot addition 5,000 square yards paving Sewer service Water service

Tufts University Joyce Cummings Center

Tufts University Joyce Cummings Center Client: PROCON LLC | Medford, MA All new underground utilities including water, sewer, drain, electric, and communications Drilled micro-pile excavation support for deep excavations New 7-Story Building on Active Campus Removal and disposal of regulated soils

ExxonMobil/Everett

ExxonMobil/Everett Everett, MA 50 acre site Secure facility Contaminated site Drainage system improvements

Ipswich Country Club

Ipswich Country Club Ipswich, MA 11,000 linear feet of drain 15,000 linear feet of electric 17,000 cubic yards of gravel imported 18,200 linear feet of water main 19,200 linear feet of sewer main 235 residential house lots 25,000 linear feet of sloped granite curb installed 28,600 cubic yards of fill moved onsite 4.5 miles of […]